The best time to plan is
before the walls go up.

Where will the office desk, ceiling speakers and Wi-Fi equipment go? NeuroDesk works with your builder to plan cable routes and equipment locations before insulation and drywall make them harder to reach.

Start your project

The drawings show the rooms. Do they show the wiring?

The office needs a wired connection. The patio needs Wi-Fi. The kitchen needs speaker wire before the ceiling closes. We mark those locations with you, then coordinate the cable routes, power needs and equipment space with your builder and trades. The network goes in first so lighting, audio and other systems have a planned place to connect.

Tell us what your home needs to do.

Share the rooms, routines, and problems you want solved. NeuroDesk will review the details and contact you with the most practical next step.

Existing homes, renovations, and new builds
One plan across networking, lighting, audio, climate, and security
Designed around the people and rooms that use it
Serving Windsor, Essex County, London, Chatham and Southwestern Ontario

New-Build Technology Planning

Your project details

Enter at least one contact method. We will use the method you choose below.

NeuroDesk will review your project and contact you about the most practical next step.

Network Infrastructure Layout

Access point locations, ethernet run paths, equipment room placement. Planned before a single cable is pulled.

Smart Home Pre-Wire

Plan cable runs for the audio, lighting, network and controls in your agreed scope. We also identify spare routes where later additions may be practical.

Builder Coordination

We coordinate equipment locations, cable routes and power requirements with your builder and electrician before installation.

Room For Later Additions

Leave accessible cable paths and space for additional connections. We explain what the plan can accommodate and which additions would need more work.

A cable route marked on the plan is easier to discuss than a hole in a finished wall.

When should I bring in a network designer during a new home build?

Bring us in while the plans are being developed, before insulation and drywall. We can then coordinate routes and equipment space with your builder. Finished walls can add access and repair work, depending on the home.

Does NeuroDesk work with custom home builders in Windsor, Essex County?

Yes. We coordinate directly with builders and their trades throughout Windsor, Essex County, and the surrounding area. We provide them with exactly what they need to do the work right the first time.

Can I get smart home automation pre-wired in a new build?

Yes. We plan the network first, then the cable and power needs of the lighting, audio and controls you want. Work at the framing stage gives the installer access before the walls close.

Can you design and install the structured wiring panel in a new home?

Yes. We design and install the central distribution point for all low-voltage cabling in the home, ensuring every run terminates correctly and the panel is organized for easy future access.